The Company's structure includes three thermal power plants - Trypilska, Vuglegirska, Zmiivska TPP and the repair service Manufacturing Enterprise (ME) "Remenergo" located in the industrially advanced regions of Ukraine - Kyiv, Donetsk and Kharkiv regions.

The total installed capacity of the power plants' units makes 7665 MW (14 % of the installed capacity of the whole electric power industry of Ukraine). The power plants are equipped with 23 power units with capacity from 175 MW up to 800 MW, including 18 coal-fired power units and 5 gas and fuel oil units.

The manufacturing enterprise "Remenergo" is PJSC "Centrenergo" structural unit which performs the activities on repairing of the main and auxiliary equipment of the Company's thermal power plants.